Application for a site-specific Environmental Authority for the Big Vein South Gold Project
Strategic Minerals Corporation has applied for a site-specific Environmental Authority under the Queensland Environmental Protection Act 1994 for the Big Vein South Gold Project, located approximately 100 km north of Richmond in North West Queensland.
This page provides access to the EA application documents, including the Environmental Assessment Report, the Progressive Rehabilitation and Closure Plan, technical appendices, and responses to the Department of the Environment, Tourism, Science and Innovation (DETSI) information request.
The application is open for public comment from 24/09/2026 to 23/10/2026 Submissions must be received on or before 4.30pm on the last day of the submission period (inclusive, Queensland time). Submissions can be made directly to DETSI following the link in the notice.
Environmental Authority Application
Information Request Response - September 2026
Environmental Assessment Report — September 2026
- Executive Summary
- Section 1 - Introduction
- Section 2 - Regulatory Framework
- Section 3 - Project Description
- Section 4 - Scoping of Environmental Assessment
- Section 5 - Groundwater
- Section 6 - Surface Water
- Section 7 - Terrestrial Ecology
- Section 8 - Aquatic Ecology
- Section 9 - Air Quality
- Section 10 - Noise and Vibration
- Section 11 - Visual Amenity
- Section 12 - Socio-Economics
- Section 13 - Traffic and Transport
- Section 14 - Cultural Heritage
- Section 15 - Non-Mining Waste Management
- Section 16 - References
- Section 17 - Glossary
- Section 18 - Abbreviations
- Section 19 - Study Team
Environmental Assessment Report - Technical Appendices September 2026
(Includes the Progressive Rehabilitation and Closure Plan (PRCP) and Technical Appendices – Appendix J)
- Appendix A - Geochemistry Report
- Appendix B - Soils Report
- Appendix C - Groundwater Report
- Appendix D - Surface Water Report
- Appendix E - Terrestrial Ecology Report
- Appendix F - Aquatic Ecology Report
- Appendix G - Air Quality Report
- Appendix H - Noise and Vibration Report
- Appendix I - Non-Indigenous Heritage Report
- Appendix J - Progressive Rehabilitation and Closure Plan
- Appendix K - Groundwater Dependent Ecosystems Report
- Appendix L - Greenhouse Gas Assessment Report